Jacobus Park Project

Wauwatosa Condo Whole House Remodel. Galley Kitchen that was completely closed off to the rest of the first floor. Opened it up (found quite a bit of structural issues) – created a sleek simple kitchen. Elevated countertop prep area, maple cabinetry, quartz tops (2 different colors), cork flooring. Built-in bookcase/china cabinet. Bathrooms featured detailed tile work, trough drain in the shower, shower glass partition, Kohler fixtures. Entire second floor installed bamboo flooring and prairie style doors.

Before

View similar projects